Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Parking
- Underground parking setbackSetbackThe distance a building must be held back from a lot line.5 ft
Subterranean parking shall be set back a minimum of 5 feet from Colorado Boulevard and RM/RS zoning.
From the ordinance
Subterranean parking shall be set back a minimum of 5 feet from Colorado Boulevard and RM/RS zoning. Otherwise, it may extend up to the property line.