Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Parking
- Parking buffer hedge heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.3 ft
Landscaped setbacks shall include hedges or shrubs with a minimum height of 3 feet at the time of planting that form a continuous visual screen to block vehicle headlights.
- Surface parking setbackSetbackThe distance a building must be held back from a lot line. from primary frontageFrontageThe length of a lot line that touches a public street.30 ft
Parking lots shall be set back a minimum of 30 feet from the primary frontage, a minimum of 10 feet from any secondary frontage, and a minimum of 5 feet from RM zoning.
- Surface parking setbackSetbackThe distance a building must be held back from a lot line. from RM zoning5 ft
Parking lots shall be set back a minimum of 30 feet from the primary frontage, a minimum of 10 feet from any secondary frontage, and a minimum of 5 feet from RM zoning.
- Surface parking setbackSetbackThe distance a building must be held back from a lot line. from secondary frontageFrontageThe length of a lot line that touches a public street.10 ft
Parking lots shall be set back a minimum of 30 feet from the primary frontage, a minimum of 10 feet from any secondary frontage, and a minimum of 5 feet from RM zoning.
From the ordinance
Parking lots shall be set back a minimum of 30 feet from the primary frontage, a minimum of 10 feet from any secondary frontage, and a minimum of 5 feet from RM zoning.