Dimensional standards
Servicing
- Geographic extent
- Army Reserve Training Center site
Uses
Permitted by right9
Conditional / special use7
Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Density
- Conversion ratio (nonresidential to residential)850 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000./unit
This allocation may be converted to residential units at a ratio of 850 square feet to one unit.
Other
- Conditional UseConditional useAllowed only after a discretionary approval — usually a public hearing and a board vote. Permit required for new construction exceeding25,000 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Conditional Use Permit approval required for new construction exceeding 25,000 sq. ft.
- Maximum new nonresidential floor area per acreacre43,560 square feet — about the size of an American football field without the end zones.17,500 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Each site in the WGSP-1A, WGSP-1B, WGSP-1C and WGSP-2 zoning districts shall receive an equal allocation of new nonresidential development of 17,500 square feet for each acre or pro rata or fraction thereof.
From the ordinance
Caretakers quarters: P; Dormitories: —; Multi-family: —; Colleges: C; Cultural: C; etc.