Dimensional standards
Servicing
- Applies near
- Foothill Boulevard
- Geographic extent
- Subarea d2 of East Pasadena Specific Plan, including lots fronting on south side of Foothill Boulevard
Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Building height measured fromHeight measured fromThe reference point height is counted from — natural grade, finished grade, or the street. Foothill property line
For lots fronting on the south side of Foothill Boulevard, the building height shall only be measured from the Foothill property line.
- TOD intensity options for parcels B-1 and B-2
Alternative 1 - FAR = 2.0; Height Limit = 60 feet; Alternative 2 - FAR = 1.5; Height Limit = 85 feet.
From the ordinance
For lots fronting on the south side of Foothill Boulevard, the building height shall only be measured from the Foothill property line. TOD intensity options: Alternative 1 - FAR = 2.0; Height Limit = 60 feet; Alternative 2 - FAR = 1.5; Height Limit = 85 feet.