3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Silhouette construction timing14 days
The temporary silhouette shall be constructed at least 14 days prior to the public hearing.
- Post top paint heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.1 ft
The top one foot of the posts shall be painted red or orange.
- Silhouette removal timing10 days
The silhouette shall be removed within 10 days after the decision has become effective.
From the ordinance
When a second-story portion of a residential (RS or RM-12) project requires a variance, the applicant shall be required to construct a temporary silhouette that depicts the proposed project.