Pasadena, California · General provision

17.43.040.C

Dimensional standards

Extracted standards

2 individual requirements pulled out of this section’s prose, each with the sentence it came from.

From the ordinance

Projects in Central District subdistricts CD-1, CD-2, CD-3, and CD-4 may be granted a density bonus of up to 50 percent above the maximum density, according to the following formula: for each additional percentage point of very low income units above 11 percent, a bonus of 2.5 percent may be granted, for each additional percentage point of low-income units above 20 percent, a bonus of 1.5 percent may be granted, and for each percentage point of moderate-income units above 40 percent, a bonus of one percent may be granted. A Conditional Use Permit shall be required for any density bonus exceeding 35 percent.
17.43.040.C