Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Exterior wall removal threshold50 pct
If more than 50% of exterior walls removed, replacement must comply with current standards.
From the ordinance
Whenever more than 50 percent of the exterior walls of a structure are removed, the replacement construction would constitute a new structure that would have to comply with all current development standards.