Pasadena, California · General provision

17.40.130

Extracted standards

3 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Minor CUP required for relocation

    Minor Conditional Use Permit approval is required for relocation of a structure to a lot within the RS or RM-12 zoning districts.

  • Time to complete exterior work365 days

    All exterior work substantially completed within 365 days or less.

  • Time to place on foundation30 days

    Structure shall be placed on its foundation within 30 days of relocation.

From the ordinance

Minor Conditional Use Permit approval is required for relocation of a structure to a lot within the RS or RM-12 zoning districts. Structure shall be placed on foundation within 30 days. Exterior work substantially completed within 365 days.
17.40.130