22.336.060
Dimensional standards
Servicing
- Applies near
- Santa Monica Mountains North
- Geographic extent
- Santa Monica Mountains North Area Community Standards DistrictZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2. boundary as shown on Figure 22.336-A
Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Habitat category permitting: S1 requires SEA CUP, S2 requires CUP, S3 with biological assessment requires CUP
Projects in S1 habitat require SEA Conditional Use Permit; S2 require at minimum Conditional Use Permit; S3 with biological assessment require Conditional Use Permit.
- New development sited to avoid most sensitive habitat in order S1, S2, S3, S4
New development shall be sited in a manner that avoids the most biologically-sensitive habitat on-site in the order S1, S2, S3, S4, prioritizing S4 habitat.
- Proof of legal access for new development not accessed directly from public roadway
Proof of legal access for any new development that is not accessed directly from a public roadway.
- Noticing radius 700 feet for permits700 ft
For all permits requiring notification by mail, the noticing radius shall be all parcels within a 700-foot radius from the subject parcel.
- Development prohibitedProhibitedNot allowed in the district at all, short of rezoning or a variance. in streams except necessary water supply projects
Development shall be prohibited in streams, except where no feasible alternative and mitigation provided, limited to necessary water supply projects.
- Proof of water availability required for new development
Proof of water availability for new or expanded residential development or other new development that requires water use.
- Diking, filling, or dredging of open waters and wetlands prohibitedProhibitedNot allowed in the district at all, short of rezoning or a variance. except certain uses
The diking, filling, or dredging of open waters and wetlands shall be prohibited, except where no feasible alternative and mitigation provided, limited to scientific research, public service, or restoration.
From the ordinance
All projects located entirely in S1 habitat shall require a SEA Conditional Use Permit. All projects located within S2 habitat shall require, at minimum, a Conditional Use Permit. New development shall be sited to avoid the most biologically-sensitive habitat in order S1, S2, S3, S4.