Los Angeles County Unincorporated, California · General provision

22.310.050

Dimensional standards

Servicing

Applies near
Ladera Heights, Windsor Hills, Oak Park, View Park, Culver Crest, Blair Hills, Raintree
Geographic extent
Applies to the oil field within the CSD (Community Standards DistrictZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2.) in the unincorporated area of Los Angeles County, near Ladera Heights, Windsor Hills, Oak Park, View Park, Culver Crest, Blair Hills, and Raintree.

Extracted standards

116 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Fencing & walls

  • Fencing requirement

    All portions of the oil field on which oil operations are conducted shall be enclosed with a fence compliant with DOGGR regulations codified at California Code of Regulations Title 14, Article 3, Sections 1778 and 1779, or as may be subsequently amended by the State.

Other

  • Abandoned well leak reporting deadline24 hours

    Abandoned wells that are found to be leaking hydrocarbons that could affect health and safety shall be reported to the Director and DOGGR within 24 hours of the abandoned well test.

  • Abandoned well testing frequency after clean results5 years

    If the test results for an abandoned well area are at or below the background levels for two consecutive years that area shall thereafter be tested every five years.

  • Abandoned well testing required

    The operator shall conduct annual hydrocarbon vapor testing of areas within the oil field that contain abandoned wells.

  • Abandonment plan submission180 days

    Within 180 days of permanent facility shut down, the operator shall submit an abandonment plan to DOGGR and submit to the Director for review and approval a time line for facility removal, site assessment, and remediation as necessary.

  • Abandonment start after approval20 days

    The operator shall begin abandonment of the site no later than 20 days after the Director's approval of the timeline

  • Access to records

    the operator shall make such records available or provide access to such facilities upon reasonable notice from the County.

  • Active pipeline site plan required

    The operator shall submit to the Fire Chief a site plan depicting the approximate location of all active pipelines

  • Annual drilling plan required

    Before the end of each calendar year, the operator shall develop and deliver to the Director an annual drilling, redrilling, well abandonment, and well pad restoration plan

  • Annual plan review deadline45 days

    The Director shall complete the review of the annual plan (and any amendments) within 45 days of receipt

  • Annual production report required

    The operator shall deliver annual production reports to the Director and the Fire Chief.

  • API standards compliance

    All derricks and portable masts used for drilling, redrilling, and reworking shall meet the standards and specifications of the American Petroleum Institute

  • Appeal deadline15 days

    the operator may file an appeal with the Hearing Officer within 15 days after the date which notice is mailed.

  • Belt guards required

    Belt guards shall be required over all drive belts on drilling, redrilling, and reworking equipment.

  • No building shall be constructed within 50 feet of any oil storage tank.

  • Community Advisory Panel required

    A CAP shall be established by the Director to foster communication about ongoing operations at the oil field

  • Annual community meetings required1 meeting/year

    The operator shall hold community meetings on an annual basis to provide updates on oil operations.

  • Complaint log required

    the operator shall maintain a written log of all complaints and provide that log to the Director, the MACC, and CAP on a quarterly basis.

  • Complaint reporting next business day

    If the complaint is received after normal business hours, it shall be reported to the environmental compliance coordinator and the agencies at the opening of the next business day.

  • Complaint reporting same business day

    All complaints related to oil operations received by the operator shall be reported on the same business day to the environmental compliance coordinator and to the Director.

  • Provided an approved Conditional Use Permit (Chapter 22.158) has first been obtained, and while such permit is in full force and effect in conformity with the conditions of such permit, the following uses may be established: 1. Drilling or redrilling that exceeds the maximum number allowed pursuant to a Ministerial Site Plan Review (Chapter 22.186); 2. Steam drive plant; and 3. New tanks with a capacity of greater than 5,000 barrels.

  • Contaminated material removal required

    All contaminated soils and materials within the well pad boundaries shall be removed and treated or disposed of in accordance with all local, County, State, and federal regulations.

  • Comply with the following: [cultural/historic resources requirements]

  • Downhole submersible pumps required where feasible

    Downhole submersible pumps and low-profile pumping units for production wells must be used wherever feasible.

  • Initial draw-down account deposit500,000 dollars

    The initial amount to be deposited by the operator shall be $500,000.

  • Draw-down account replenishment deadline30 days

    the operator shall deposit $50,000 in supplemental funds within 30 business days of notification.

  • Supplemental draw-down account deposit50,000 dollars

    After the first year, if the balance in the draw-down account is reduced at any time to $50,000, the operator shall deposit $50,000 in supplemental funds

  • Drill site conditions

    All drilling sites shall be maintained in a neat and orderly fashion.

  • Early review trigger violations3 violations

    the Director shall consider whether an early review should be undertaken if more than three material violations occur within any 12-month period.

  • Electric motors required for well pumping units

    All well pumping units shall be operated by electric motors.

  • Annual emergency response drill required1 drill/year

    The operator shall demonstrate the effectiveness of the emergency response plan by responding to one planned emergency response drill per year

  • Environmental compliance coordinator required

    The operator shall recommend and fund the environmental compliance coordinators.

  • EQAP report submission deadline60 days

    Within 60 days following the end of each calendar year, the operator shall submit to the Director an annual EQAP report

  • Environmental Quality Assurance Program required

    The operator shall comply with all provisions of an environmental quality assurance program that has been approved by the Director.

  • EQAP update response deadline30 days

    The operator shall respond to any request for additional information within 30 days of receiving such request.

  • Equipment removal after drilling90 days

    All drilling and redrilling equipment shall be removed from the site within 90 days following the completion of drilling or redrilling activities unless the equipment is to be used at the oil field within five days for drilling or redrilling operations.

  • Facility removal after end of useful life365 days

    All facilities that have reached the end of their useful economic life shall be properly decommissioned and removed from the oil field within one year.

  • Fire safety compliance

    All drilling, redrilling, and reworking shall be in conformance with applicable fire and safety regulations.

  • Groundwater monitoring required

    The operator shall develop, implement, and carry out a groundwater quality monitoring program for the oil field

  • Hazardous materials business plan required

    The operator shall comply with all provisions of a hazardous materials business plan that has been submitted to the Fire Chief.

  • Idle well testing required

    The operator shall comply with Title 14 of the California Code of Regulations, Section 1723.9, regarding testing and maintenance of idle wells

  • Indemnification required

    The operator shall enter into an agreement with the County to indemnify and hold harmless the County

  • Initial review maximum years5 years

    and no later than five years after the effective date of the ordinance establishing this CSD

  • Initial review minimum years3 years

    The initial review shall occur no sooner than three years

  • Insurance provision deadline90 days

    Within 90 days following the effective date of the ordinance establishing this CSD

  • Insurance required

    the operator shall provide evidence of insurance coverage that meets County requirements as required and approved by the CEO including identifying the County and its elected and appointed officers and employees as additional insureds.

  • Lighting restrictions

    Outdoor lighting restricted to code-required building exteriors, drilling/redrilling rigs, safety, and security.

  • Multiple Agency Coordination Committee required

    A MACC shall be established to coordinate activities and communications between the various agencies with regulatory authority over the oil operations within the district.

  • Machinery enclosures required

    The operator shall maintain enclosures around machinery with moving parts consisting of a fence, screening, or housing.

  • Maximum number of drilling/redrilling rigs3 rigs

    No more than three drilling or redrilling rigs shall be present within the oil field at any one time.

  • Maximum newly drilled wells per year45 wells

    with the maximum number of newly drilled wells of that total, limited to 45 per year

  • Maximum number of reworking rigs8 rigs

    No more than eight reworking rigs shall be present within the oil field at any one time, unless an emergency condition requires additional reworking rigs.

  • Maximum wells over 20 years600 wells

    Approval through Ministerial Site Plan Review for drilling new wells shall be limited to 600 wells over 20 years

  • Maximum wells in first year24 wells

    except that during the first year following the effective date of the ordinance establishing this CSD, new drilling and redrilling shall be limited to no more than 24 wells.

  • Maximum wells per year (Ministerial Site Plan Review)53 wells

    New drilling and redrilling approved through a Ministerial Site Plan Review procedure shall be limited to no more than 53 wells per year, with the maximum number of newly drilled wells of that total, limited to 45 per year

  • Ministerial Site Plan Review required

    The operator shall apply for and receive approval of a Ministerial Site Plan Review (Chapter 22.186) prior to any new drilling and redrilling.

  • Muffled engines required

    All engines used for drilling and redrilling operations shall be operated by muffled internal-combustion engines or by electric motors.

  • New tank capacity requiring CUP5,000 barrels

    New tanks with a capacity of greater than 5,000 barrels.

  • New technology consideration

    Proven reasonable and feasible technological improvements which are capable of reducing the environmental impacts of drilling and redrilling shall be considered

  • Newsletter mailing distance1,000 ft

    The newsletter shall be mailed by the operator to all owners of property located within 1,000 feet of the outer boundary line; all owners of property within 1,000 feet of the perimeter of the district

  • Annual newsletter required1 newsletter/year

    The operator shall publish an informational newsletter annually

  • Noise monitoring required

    The Public Health Department shall retain an independent qualified acoustical engineer to monitor ambient noise levels in the areas surrounding the oil field

  • Oil field waste removal compliance

    Comply with: [oil field waste removal requirements]

  • Ombudsperson required

    Ombudsperson [section text incomplete]

  • Opening protection required

    The operator shall cap, close, or protect the openings in all oil wells, test holes, and similar excavation

  • Outdoor storage compliance

    All outside storage of parts or equipment shall comply with Chapter 22.140.430 (Outdoor Storage).

  • Painting required

    All oil operation-related structures visible from public roadways and surrounding properties painted or surfaced with a compatible color approved by the Director.

  • Parking compliance

    Vehicular parking shall comply with Chapter 22.112 (Parking).

  • Maximum penalty per day10,000 dollars/day

    or more than $10,000 per day per violation

  • Minimum penalty per day1,000 dollars/day

    The operator shall be subject to a penalty for violation of any requirement of this Chapter as determined by, and at the discretion of, the Director in an amount not less than $1,000

  • Initial penalty trust fund deposit100,000 dollars

    the operator shall deposit the sum of $100,000 in an interest-bearing trust fund with the Department within 30 days following the effective date of the ordinance establishing this CSD

  • Penalty trust fund replenishment deadline10 days

    the operator shall deposit additional funds sufficient to bring the balance up to the amount of the initial deposit ($100,000) within 10 business days of notification.

  • Performance bond continuation after change of operator1 years

    The performance bond shall continue in force for one year following any sale, transfer, assignment, or other change of operator of the oil field

  • Performance bond required

    Prior to issuance of the first drilling or redrilling permit pursuant to this Chapter, the operator shall provide to the Department a faithful performance bond or financial instrument

  • Periodic review frequency5 years

    The County shall conduct a comprehensive review of the provisions of this Chapter at least every five years

  • Pipeline burial required

    New pipelines that remove oil or gas from the oil field shall be buried below the surface of the ground

  • Pipeline corridor consolidation

    New pipeline corridors shall be consolidated with existing pipelines or electrical transmission corridors where feasible

  • Pipeline cover required

    All pipelines which are not enclosed within a fence shall be placed underground or covered with materials approved by the Fire Chief.

  • Pipeline replacement application deadline180 days

    the operator shall within 180 days of the date the existing pipeline becomes unavailable, seek to acquire a private right of way or easement

  • Pipeline site plan submission deadline30 days

    The site plan shall be submitted within 30 days of the installation of any new pipelines or the relocation of an existing pipeline.

  • Pipeline site restoration

    Upon completion of pipeline construction, the site shall be restored to the approximate previous grade and condition.

  • Pipeline transport required

    All oil, gas, and other hydrocarbons produced from any well in the oil field shall be shipped and transported through pipelines, except in case of an emergency or when access to a pipeline becomes unavailable.

  • Limits on processing operations

    Unless otherwise expressly required by DOGGR, the only processing operations permitted at the well site shall be the dehydration of oil and gas produced from the well; the storage, handling, recycling, and transportation of such materials; and those processing operations required for water injection purposes.

  • Reduced throughput triggering review630 barrels/day

    When oil or gas throughput is less than 630 barrels per day, the Director shall conduct a public hearing to determine if shut down of the oil field or other actions are appropriate.

  • No refining shall be conducted within the oil field.

  • Revegetation after termination of use90 days

    Areas not slated for future use shall be restored and revegetated within 90 days of termination of use

  • Revegetation required

    The well pad shall be revegetated following the requirement of the native habitat restoration plan.

  • Reworking hours of operation

    With exception of emergencies, well reworking operations shall not be allowed after 7:00 p.m. or before 7:00 a.m., nor on Sundays or legal holidays.

  • Reworking rig removal7 days

    Reworking rigs shall be removed from the oil field within seven days following the completion of reworking operations unless such rig will be used on another well at the oil field within five days.

  • Right of entry

    Any officer or employee of the County, or his or her duly appointed representative, whose duties require the inspection of the oil field premises shall have the right and privilege at all reasonable times, to enter upon any premises

  • Sanitation required

    The oil field shall be maintained in a clean, sanitary condition, free from accumulations of garbage, refuse, and other wastes.

  • 24-hour security guard

    The operator shall have a security guard on duty 24 hours per day.

  • Safety Inspection, Maintenance, and Quality Assurance Program required

    The operator shall comply with all provisions of a SIMQAP that has been approved by the Director and the Fire Chief.

  • SIMQAP update response deadline30 days

    The operator shall respond to any request for additional information within 30 days of receiving such request from the Director

  • SIMQAP update frequency5 years

    The operator shall make such revisions at least every five years

  • Site cleanup required

    The operator shall leave the site entirely free of oil, rotary mud, oil-soaked earth, asphalt, tar, concrete, litter, debris, and other substances

  • Sliding gates at unmanned entrances

    All unmanned entrances to the oil field shall be equipped with sliding gates which shall be kept closed at all times except when authorized vehicles are entering or leaving the oil field.

  • Stormwater and drainage management compliance

    Comply with: [stormwater and drainage management requirements]

  • Sump closure required

    The operator shall clean out all sumps, cellars, and ditches, and level and fill all sumps and depressions pursuant to DOGGR requirements.

  • Sump compliance

    Comply with: [sump requirements]

  • Tank leak detection required

    The operator shall design, implement, and comply with a program, approved by the Fire Chief, for controlling and detecting tank bottom leaks on all tanks at the oil field.

  • Tank piping standards

    All new tank piping, valves, fittings, and connections including normal and emergency relief venting, shall be installed and maintained in accordance with current American Petroleum Institute standards

  • No new storage tank, excluding a replacement tank, shall be constructed closer than 500 feet from any developed area

  • or closer than 200 feet from a public road.

  • Tank standards compliance

    All new tanks and appurtenances shall be designed, constructed, installed, and maintained in accordance with current Title 32 (Fire Code) of the County Code, American Petroleum Institute, DOGGR, California Division of Industrial Safety, Environmental Protection Agency Standards

  • Toilet and wash facilities required

    Sanitary toilet and washing facilities shall be installed at any site where personnel are permanently stationed.

  • Maximum unannounced drills per year2 drills/year

    the operator shall demonstrate the effectiveness of the emergency response plan by responding to not more than two unannounced drills each year

  • Vapor recovery required

    Oil, wash, and produced water tanks shall be vapor tight and shall be equipped with a vapor recovery system.

  • Vibration monitoring required

    The Public Health Department shall retain an independent qualified acoustical engineer to monitor vibration in the areas surrounding the oil field

  • Water/brine disposal

    Any and all water or brine produced during pipeline construction shall either be injected in accordance with DOGGR requirements, or disposed of in accordance with other local, State or federal regulations

  • Water management plan required

    The operator shall comply with all provisions of a water management plan that has been approved by the Director and the Director of Public Works.

  • Water management plan review frequency3 years

    The water management plan shall be reviewed by the operator every three years

  • Oil field web site required

    The operator shall maintain and update on a regular basis an oil field web site

  • Well cellar standards

    Constructed per most current American Petroleum Institute standards.

  • Well pad restoration required

    If the well pad associated with the abandoned well does not contain other production, injection, or idle wells, and will not be used for future drilling, then the operator shall promptly abandon the well pad

  • County request for well status review

    The Director may periodically review the status of the operator's wells and submit to DOGGR a list of wells the Director believes should be plugged and abandoned

From the ordinance

All portions of the oil field on which oil operations are conducted shall be enclosed with a fence compliant with DOGGR regulations codified at California Code of Regulations Title 14, Article 3, Sections 1778 and 1779
22.310.050