22.310.050
Dimensional standards
Servicing
- Applies near
- Ladera Heights, Windsor Hills, Oak Park, View Park, Culver Crest, Blair Hills, Raintree
- Geographic extent
- Applies to the oil field within the CSD (Community Standards DistrictZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2.) in the unincorporated area of Los Angeles County, near Ladera Heights, Windsor Hills, Oak Park, View Park, Culver Crest, Blair Hills, and Raintree.
Extracted standards
116 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Fencing & walls
- Fencing requirement
All portions of the oil field on which oil operations are conducted shall be enclosed with a fence compliant with DOGGR regulations codified at California Code of Regulations Title 14, Article 3, Sections 1778 and 1779, or as may be subsequently amended by the State.
Other
- Abandoned well leak reporting deadline24 hours
Abandoned wells that are found to be leaking hydrocarbons that could affect health and safety shall be reported to the Director and DOGGR within 24 hours of the abandoned well test.
- Abandoned well testing frequency after clean results5 years
If the test results for an abandoned well area are at or below the background levels for two consecutive years that area shall thereafter be tested every five years.
- Abandoned well testing required
The operator shall conduct annual hydrocarbon vapor testing of areas within the oil field that contain abandoned wells.
- Abandonment plan submission180 days
Within 180 days of permanent facility shut down, the operator shall submit an abandonment plan to DOGGR and submit to the Director for review and approval a time line for facility removal, site assessment, and remediation as necessary.
- Abandonment start after approval20 days
The operator shall begin abandonment of the site no later than 20 days after the Director's approval of the timeline
- Access to records
the operator shall make such records available or provide access to such facilities upon reasonable notice from the County.
- Active pipeline site plan required
The operator shall submit to the Fire Chief a site plan depicting the approximate location of all active pipelines
- Annual drilling plan required
Before the end of each calendar year, the operator shall develop and deliver to the Director an annual drilling, redrilling, well abandonment, and well pad restoration plan
- Annual plan review deadline45 days
The Director shall complete the review of the annual plan (and any amendments) within 45 days of receipt
- Annual production report required
The operator shall deliver annual production reports to the Director and the Fire Chief.
- API standards compliance
All derricks and portable masts used for drilling, redrilling, and reworking shall meet the standards and specifications of the American Petroleum Institute
- Appeal deadline15 days
the operator may file an appeal with the Hearing Officer within 15 days after the date which notice is mailed.
- Belt guards required
Belt guards shall be required over all drive belts on drilling, redrilling, and reworking equipment.
- Building setbackSetbackThe distance a building must be held back from a lot line. from oil storage tank50 ft
No building shall be constructed within 50 feet of any oil storage tank.
- Community Advisory Panel required
A CAP shall be established by the Director to foster communication about ongoing operations at the oil field
- Annual community meetings required1 meeting/year
The operator shall hold community meetings on an annual basis to provide updates on oil operations.
- Complaint log required
the operator shall maintain a written log of all complaints and provide that log to the Director, the MACC, and CAP on a quarterly basis.
- Complaint reporting next business day
If the complaint is received after normal business hours, it shall be reported to the environmental compliance coordinator and the agencies at the opening of the next business day.
- Complaint reporting same business day
All complaints related to oil operations received by the operator shall be reported on the same business day to the environmental compliance coordinator and to the Director.
- Conditional UseConditional useAllowed only after a discretionary approval — usually a public hearing and a board vote. Permit required for certain uses
Provided an approved Conditional Use Permit (Chapter 22.158) has first been obtained, and while such permit is in full force and effect in conformity with the conditions of such permit, the following uses may be established: 1. Drilling or redrilling that exceeds the maximum number allowed pursuant to a Ministerial Site Plan Review (Chapter 22.186); 2. Steam drive plant; and 3. New tanks with a capacity of greater than 5,000 barrels.
- Contaminated material removal required
All contaminated soils and materials within the well pad boundaries shall be removed and treated or disposed of in accordance with all local, County, State, and federal regulations.
- Cultural/HistoricHistoric districtAn area where exterior changes need design review to protect its character. resources compliance
Comply with the following: [cultural/historic resources requirements]
- Downhole submersible pumps required where feasible
Downhole submersible pumps and low-profile pumping units for production wells must be used wherever feasible.
- Initial draw-down account deposit500,000 dollars
The initial amount to be deposited by the operator shall be $500,000.
- Draw-down account replenishment deadline30 days
the operator shall deposit $50,000 in supplemental funds within 30 business days of notification.
- Supplemental draw-down account deposit50,000 dollars
After the first year, if the balance in the draw-down account is reduced at any time to $50,000, the operator shall deposit $50,000 in supplemental funds
- Drill site conditions
All drilling sites shall be maintained in a neat and orderly fashion.
- Early review trigger violations3 violations
the Director shall consider whether an early review should be undertaken if more than three material violations occur within any 12-month period.
- Electric motors required for well pumping units
All well pumping units shall be operated by electric motors.
- Annual emergency response drill required1 drill/year
The operator shall demonstrate the effectiveness of the emergency response plan by responding to one planned emergency response drill per year
- Environmental compliance coordinator required
The operator shall recommend and fund the environmental compliance coordinators.
- EQAP report submission deadline60 days
Within 60 days following the end of each calendar year, the operator shall submit to the Director an annual EQAP report
- Environmental Quality Assurance Program required
The operator shall comply with all provisions of an environmental quality assurance program that has been approved by the Director.
- EQAP update response deadline30 days
The operator shall respond to any request for additional information within 30 days of receiving such request.
- Equipment removal after drilling90 days
All drilling and redrilling equipment shall be removed from the site within 90 days following the completion of drilling or redrilling activities unless the equipment is to be used at the oil field within five days for drilling or redrilling operations.
- Facility removal after end of useful life365 days
All facilities that have reached the end of their useful economic life shall be properly decommissioned and removed from the oil field within one year.
- Fire safety compliance
All drilling, redrilling, and reworking shall be in conformance with applicable fire and safety regulations.
- Groundwater monitoring required
The operator shall develop, implement, and carry out a groundwater quality monitoring program for the oil field
- Hazardous materials business plan required
The operator shall comply with all provisions of a hazardous materials business plan that has been submitted to the Fire Chief.
- Idle well testing required
The operator shall comply with Title 14 of the California Code of Regulations, Section 1723.9, regarding testing and maintenance of idle wells
- Indemnification required
The operator shall enter into an agreement with the County to indemnify and hold harmless the County
- Initial review maximum years5 years
and no later than five years after the effective date of the ordinance establishing this CSD
- Initial review minimum years3 years
The initial review shall occur no sooner than three years
- Insurance provision deadline90 days
Within 90 days following the effective date of the ordinance establishing this CSD
- Insurance required
the operator shall provide evidence of insurance coverage that meets County requirements as required and approved by the CEO including identifying the County and its elected and appointed officers and employees as additional insureds.
- Lighting restrictions
Outdoor lighting restricted to code-required building exteriors, drilling/redrilling rigs, safety, and security.
- Multiple Agency Coordination Committee required
A MACC shall be established to coordinate activities and communications between the various agencies with regulatory authority over the oil operations within the district.
- Machinery enclosures required
The operator shall maintain enclosures around machinery with moving parts consisting of a fence, screening, or housing.
- Maximum number of drilling/redrilling rigs3 rigs
No more than three drilling or redrilling rigs shall be present within the oil field at any one time.
- Maximum newly drilled wells per year45 wells
with the maximum number of newly drilled wells of that total, limited to 45 per year
- Maximum number of reworking rigs8 rigs
No more than eight reworking rigs shall be present within the oil field at any one time, unless an emergency condition requires additional reworking rigs.
- Maximum wells over 20 years600 wells
Approval through Ministerial Site Plan Review for drilling new wells shall be limited to 600 wells over 20 years
- Maximum wells in first year24 wells
except that during the first year following the effective date of the ordinance establishing this CSD, new drilling and redrilling shall be limited to no more than 24 wells.
- Maximum wells per year (Ministerial Site Plan Review)53 wells
New drilling and redrilling approved through a Ministerial Site Plan Review procedure shall be limited to no more than 53 wells per year, with the maximum number of newly drilled wells of that total, limited to 45 per year
- Ministerial Site Plan Review required
The operator shall apply for and receive approval of a Ministerial Site Plan Review (Chapter 22.186) prior to any new drilling and redrilling.
- Muffled engines required
All engines used for drilling and redrilling operations shall be operated by muffled internal-combustion engines or by electric motors.
- New tank capacity requiring CUP5,000 barrels
New tanks with a capacity of greater than 5,000 barrels.
- New technology consideration
Proven reasonable and feasible technological improvements which are capable of reducing the environmental impacts of drilling and redrilling shall be considered
- Newsletter mailing distance1,000 ft
The newsletter shall be mailed by the operator to all owners of property located within 1,000 feet of the outer boundary line; all owners of property within 1,000 feet of the perimeter of the district
- Annual newsletter required1 newsletter/year
The operator shall publish an informational newsletter annually
- Noise monitoring required
The Public Health Department shall retain an independent qualified acoustical engineer to monitor ambient noise levels in the areas surrounding the oil field
- Oil field waste removal compliance
Comply with: [oil field waste removal requirements]
- Ombudsperson required
Ombudsperson [section text incomplete]
- Opening protection required
The operator shall cap, close, or protect the openings in all oil wells, test holes, and similar excavation
- Outdoor storage compliance
All outside storage of parts or equipment shall comply with Chapter 22.140.430 (Outdoor Storage).
- Painting required
All oil operation-related structures visible from public roadways and surrounding properties painted or surfaced with a compatible color approved by the Director.
- Parking compliance
Vehicular parking shall comply with Chapter 22.112 (Parking).
- Maximum penalty per day10,000 dollars/day
or more than $10,000 per day per violation
- Minimum penalty per day1,000 dollars/day
The operator shall be subject to a penalty for violation of any requirement of this Chapter as determined by, and at the discretion of, the Director in an amount not less than $1,000
- Initial penalty trust fund deposit100,000 dollars
the operator shall deposit the sum of $100,000 in an interest-bearing trust fund with the Department within 30 days following the effective date of the ordinance establishing this CSD
- Penalty trust fund replenishment deadline10 days
the operator shall deposit additional funds sufficient to bring the balance up to the amount of the initial deposit ($100,000) within 10 business days of notification.
- Performance bond continuation after change of operator1 years
The performance bond shall continue in force for one year following any sale, transfer, assignment, or other change of operator of the oil field
- Performance bond required
Prior to issuance of the first drilling or redrilling permit pursuant to this Chapter, the operator shall provide to the Department a faithful performance bond or financial instrument
- Periodic review frequency5 years
The County shall conduct a comprehensive review of the provisions of this Chapter at least every five years
- Pipeline burial required
New pipelines that remove oil or gas from the oil field shall be buried below the surface of the ground
- Pipeline corridor consolidation
New pipeline corridors shall be consolidated with existing pipelines or electrical transmission corridors where feasible
- Pipeline cover required
All pipelines which are not enclosed within a fence shall be placed underground or covered with materials approved by the Fire Chief.
- Pipeline replacement application deadline180 days
the operator shall within 180 days of the date the existing pipeline becomes unavailable, seek to acquire a private right of way or easement
- Pipeline site plan submission deadline30 days
The site plan shall be submitted within 30 days of the installation of any new pipelines or the relocation of an existing pipeline.
- Pipeline site restoration
Upon completion of pipeline construction, the site shall be restored to the approximate previous grade and condition.
- Pipeline transport required
All oil, gas, and other hydrocarbons produced from any well in the oil field shall be shipped and transported through pipelines, except in case of an emergency or when access to a pipeline becomes unavailable.
- Limits on processing operations
Unless otherwise expressly required by DOGGR, the only processing operations permitted at the well site shall be the dehydration of oil and gas produced from the well; the storage, handling, recycling, and transportation of such materials; and those processing operations required for water injection purposes.
- Reduced throughput triggering review630 barrels/day
When oil or gas throughput is less than 630 barrels per day, the Director shall conduct a public hearing to determine if shut down of the oil field or other actions are appropriate.
No refining shall be conducted within the oil field.
- Revegetation after termination of use90 days
Areas not slated for future use shall be restored and revegetated within 90 days of termination of use
- Revegetation required
The well pad shall be revegetated following the requirement of the native habitat restoration plan.
- Reworking hours of operation
With exception of emergencies, well reworking operations shall not be allowed after 7:00 p.m. or before 7:00 a.m., nor on Sundays or legal holidays.
- Reworking rig removal7 days
Reworking rigs shall be removed from the oil field within seven days following the completion of reworking operations unless such rig will be used on another well at the oil field within five days.
- Right of entry
Any officer or employee of the County, or his or her duly appointed representative, whose duties require the inspection of the oil field premises shall have the right and privilege at all reasonable times, to enter upon any premises
- Sanitation required
The oil field shall be maintained in a clean, sanitary condition, free from accumulations of garbage, refuse, and other wastes.
- 24-hour security guard
The operator shall have a security guard on duty 24 hours per day.
- Safety Inspection, Maintenance, and Quality Assurance Program required
The operator shall comply with all provisions of a SIMQAP that has been approved by the Director and the Fire Chief.
- SIMQAP update response deadline30 days
The operator shall respond to any request for additional information within 30 days of receiving such request from the Director
- SIMQAP update frequency5 years
The operator shall make such revisions at least every five years
- Site cleanup required
The operator shall leave the site entirely free of oil, rotary mud, oil-soaked earth, asphalt, tar, concrete, litter, debris, and other substances
- Sliding gates at unmanned entrances
All unmanned entrances to the oil field shall be equipped with sliding gates which shall be kept closed at all times except when authorized vehicles are entering or leaving the oil field.
- Stormwater and drainage management compliance
Comply with: [stormwater and drainage management requirements]
- Sump closure required
The operator shall clean out all sumps, cellars, and ditches, and level and fill all sumps and depressions pursuant to DOGGR requirements.
- Sump compliance
Comply with: [sump requirements]
- Tank leak detection required
The operator shall design, implement, and comply with a program, approved by the Fire Chief, for controlling and detecting tank bottom leaks on all tanks at the oil field.
- Tank piping standards
All new tank piping, valves, fittings, and connections including normal and emergency relief venting, shall be installed and maintained in accordance with current American Petroleum Institute standards
- Tank setbackSetbackThe distance a building must be held back from a lot line. from developed area500 ft
No new storage tank, excluding a replacement tank, shall be constructed closer than 500 feet from any developed area
- Tank setbackSetbackThe distance a building must be held back from a lot line. from public road200 ft
or closer than 200 feet from a public road.
- Tank standards compliance
All new tanks and appurtenances shall be designed, constructed, installed, and maintained in accordance with current Title 32 (Fire Code) of the County Code, American Petroleum Institute, DOGGR, California Division of Industrial Safety, Environmental Protection Agency Standards
- Toilet and wash facilities required
Sanitary toilet and washing facilities shall be installed at any site where personnel are permanently stationed.
- Maximum unannounced drills per year2 drills/year
the operator shall demonstrate the effectiveness of the emergency response plan by responding to not more than two unannounced drills each year
- Vapor recovery required
Oil, wash, and produced water tanks shall be vapor tight and shall be equipped with a vapor recovery system.
- Vibration monitoring required
The Public Health Department shall retain an independent qualified acoustical engineer to monitor vibration in the areas surrounding the oil field
- Water/brine disposal
Any and all water or brine produced during pipeline construction shall either be injected in accordance with DOGGR requirements, or disposed of in accordance with other local, State or federal regulations
- Water management plan required
The operator shall comply with all provisions of a water management plan that has been approved by the Director and the Director of Public Works.
- Water management plan review frequency3 years
The water management plan shall be reviewed by the operator every three years
- Oil field web site required
The operator shall maintain and update on a regular basis an oil field web site
- Well cellar standards
Constructed per most current American Petroleum Institute standards.
- Well pad restoration required
If the well pad associated with the abandoned well does not contain other production, injection, or idle wells, and will not be used for future drilling, then the operator shall promptly abandon the well pad
- County request for well status review
The Director may periodically review the status of the operator's wells and submit to DOGGR a list of wells the Director believes should be plugged and abandoned
From the ordinance
All portions of the oil field on which oil operations are conducted shall be enclosed with a fence compliant with DOGGR regulations codified at California Code of Regulations Title 14, Article 3, Sections 1778 and 1779