22.310.050
Extracted standards
10 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Noise
- Drilling quiet mode plan required
Within 90 days following the effective date... the operator shall develop and submit to the Director and the Director of Public Health for review and approval a drilling quiet mode plan...
Other
- Accumulated ground movement study required
Within 90 days following the effective date... the operator shall submit to DOGGR and the Director of Public Works an implementation plan for determining the accumulated ground movement...
- Erosion control plan required
Within 180 days following the effective date... the operator shall develop and submit to the Director of Public Works for review and approval an erosion control plan that satisfies the requirements of Section 22.310.050.D.3.a.
- Groundwater monitoring required
Within one year following the effective date... the operator shall design a groundwater quality monitoring program and install monitoring wells...
- Landscaping plan required
Within 180 days following the effective date... the operator shall develop and submit to the Director, for review and approval, a landscaping plan...
- Recycling plan required
Within 180 days following the effective date... the operator shall develop and submit to the Director of Public Works for review and approval a recycling plan...
- Special status species and habitat protection plan required
Within 180 days following the effective date... the operator shall develop and submit to the Director, for review and approval, a special status species and habitat protection plan...
- Water management plan required
Within 180 days following the effective date... the operator shall develop and submit to the Director and the Director of Public Works for review and approval a water management plan...
- Worker training required
Within 120 days following the effective date... the operator shall have a qualified archaeologist prepare the training material...
Signage
- Perimeter identification signs required
Within 60 days following the effective date... the operator shall post the identification signs required by Section 22.310.050.M.1.
From the ordinance
Within 180 days following the effective date... the operator shall develop and submit to the Director of Public Works for review and approval an erosion control plan...