Los Angeles County Unincorporated, California · General provision

22.310.050

Extracted standards

10 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Noise

  • Drilling quiet mode plan required

    Within 90 days following the effective date... the operator shall develop and submit to the Director and the Director of Public Health for review and approval a drilling quiet mode plan...

Other

  • Accumulated ground movement study required

    Within 90 days following the effective date... the operator shall submit to DOGGR and the Director of Public Works an implementation plan for determining the accumulated ground movement...

  • Erosion control plan required

    Within 180 days following the effective date... the operator shall develop and submit to the Director of Public Works for review and approval an erosion control plan that satisfies the requirements of Section 22.310.050.D.3.a.

  • Groundwater monitoring required

    Within one year following the effective date... the operator shall design a groundwater quality monitoring program and install monitoring wells...

  • Landscaping plan required

    Within 180 days following the effective date... the operator shall develop and submit to the Director, for review and approval, a landscaping plan...

  • Recycling plan required

    Within 180 days following the effective date... the operator shall develop and submit to the Director of Public Works for review and approval a recycling plan...

  • Special status species and habitat protection plan required

    Within 180 days following the effective date... the operator shall develop and submit to the Director, for review and approval, a special status species and habitat protection plan...

  • Water management plan required

    Within 180 days following the effective date... the operator shall develop and submit to the Director and the Director of Public Works for review and approval a water management plan...

  • Worker training required

    Within 120 days following the effective date... the operator shall have a qualified archaeologist prepare the training material...

Signage

  • Perimeter identification signs required

    Within 60 days following the effective date... the operator shall post the identification signs required by Section 22.310.050.M.1.

From the ordinance

Within 180 days following the effective date... the operator shall develop and submit to the Director of Public Works for review and approval an erosion control plan...