22.140.400.A.2
Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Combustible material clearance25 ft
The area within 25 feet of any oil well or production facility shall be kept free of dry weeds, brush, or other combustible material.
- Equipment removal after work90 days
Any equipment used to repair, clean out, plug and abandon, or for any other work on an existing well, shall be removed within 90 days after completion of such activities.
- Graffiti removal time24 hours
If graffiti occurs, the operator shall remove such graffiti within 24 hours, weather permitting.
- Minimum bond per well152,000 usd
The amount of the bond shall be not less than $152,000 per well.
- New oil wells prohibitedProhibitedNot allowed in the district at all, short of rezoning or a variance.
New oil wells and production facilities are prohibited in all zones.
- Restoration after abandonment90 days
Within 90 days after the abandonment of any well, the well site shall be restored as nearly as practicable to its original condition.
- Restoration after plugging60 days
Restoration of the well site shall be completed within 60 days following plugging and abandonment of the well.
From the ordinance
New oil wells and production facilities are prohibited in all zones.