Los Angeles County Unincorporated, California · General provision

22.258.070

Dimensional standards

Servicing

Applies near
Eaton Fire Burn Area
Geographic extent
Applies to parcels located in the unincorporated areas affected by the Eaton Fire, as identified on the Eaton Fire Burn Area map.

Extracted standards

7 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Disaster Recovery Permit required for rebuild projects

    The Disaster Recovery Permit is established to allow disaster rebuild projects, which can be a like-for-like rebuild project, a non-like-for-like rebuild project, or a standalone accessory dwelling unit.

  • Law enforcement facilities mitigation fee

    The fees provided in this Chapter shall also be imposed upon a previously improved lot when a building permit is issued to add 1,000 square feet, or more, to an existing building unit upon such lot.

  • Law enforcement fee exemption for residential additions2,000 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.

    additions to residential structures that are less than 2,000 square feet in size shall not be subject to the fees otherwise required by this Chapter.

  • Law enforcement fee exemption for restoration

    No fee imposed by this Chapter shall be imposed upon the issuance of building permit for the restoration of existing buildings, or buildings damaged by fire, or natural disasters such as earthquake, wind, or flood, where the replaced building, or portion thereof, does not exceed the original gross floor area.

  • Library facilities mitigation fee

    No building or similar permit for residential use shall be issued and no new residential use of an existing building shall occur until the applicant has paid the applicable library facilities mitigation fee to the County Librarian.

  • Permit expiration date

    an approved application shall be used by January 7, 2030, which is five years after the Board of Supervisors proclaimed the existence of a local emergency for the January 2025 Windstorm and Critical Fire Events.

  • Permit extension1 year

    the Director may, one time, extend the time limit for a period not to exceed one year.

From the ordinance

This Chapter applies to parcels located in the unincorporated areas affected by the Eaton Fire, as identified on the Eaton Fire Burn Area map, below.
22.258.070