Los Angeles County Unincorporated, California · General provision
22.44.1430
Dimensional standards
Servicing
- Geographic extent
- Coastal Zone
Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Environmental
- Full remediation commencement1 year
Full remediation of disturbed soil or locally-indigenous vegetation shall commence one year from the date of the issuance of the CDP, if further development of the disturbed site in conjunction with an approved project has not occurred.
- Restoration of disturbed areas90 days
Within 90 days from completion of exploratory testing, all disturbed areas shall be stabilized with temporary erosion control measures and seeded with locally-indigenous grass species to prevent erosion and instability.
From the ordinance
Property in any zone may be used for exploratory testing, provided that a minor CDP has first been obtained as provided in Section 22.44.800 et seq.