Los Angeles County Unincorporated, California · General provision

22.44.1440

Dimensional standards

Servicing

Geographic extent
Coastal Zone

Extracted standards

4 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Story poles erected prior to hearing30 days

    If not already in place, story poles shall be erected at least 30 calendar days prior to the hearing date.

  • The top two feet of poles shall be painted red or orange to better identify the height of the proposed structure.

  • Story pole construction material

    Story poles shall be constructed of two-inch by four-inch lumber or other sturdy material.

  • Story poles removal after final decision7 days

    Story poles shall be removed within seven calendar days after a final decision on a CDP has been made and the appeal process has been exhausted.

From the ordinance

All new development within the Coastal Zone shall meet the following requirements... to protect the area's unique visual resources, and protect and, where feasible, enhance the quality of scenic resources.
22.44.1440