22.44.1220
Dimensional standards
Servicing
- Geographic extent
- Coastal Zone
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Abandonment period12 months
If any legal non-conforming/legal conforming use is abandoned for a continuous period of not less than 12 months, any subsequent use shall be in consistency with the regulations
- Addition threshold50 pct
Additions that increase the square footage of existing legal non-conforming/legal conforming structures by 50 percent or more are not permitted unless brought into consistency
- Reconstruction threshold50 pct
demolition and/or reconstruction that results in replacement of 50 percent or more of legal non-conforming/legal conforming buildings or structures is not permitted unless brought into consistency
- Repair and maintenance of nonconformingNonconformingLawful when built, but not compliant with the rules now in force; usually allowed to continue but not to expand. structures
Legal non-conforming/legal conforming buildings or structures may be repaired and maintained if it does not result in enlargement or expansion of the structure or increase the size or degree of inconsistency with the provisions of the LCP.
From the ordinance
Legal non-conforming/legal conforming buildings or structures as defined by subsection A above may be repaired and maintained if it does not result in enlargement or expansion of the structure or increase the size or degree of inconsistency with the provisions of the LCP.