Manassas, Virginia · General provision

Sec. 130-67

Extracted standards

3 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Minimum backup power48 hours

    Resilient power supply systems shall be capable of providing a minimum of 48 hours of backup power.

  • Noise limit

    Noise produced by resilient power supply systems shall not exceed the noise maximums of Chapter 58 (Environment).

  • Opaque screening required

    Opaque screening meeting the requirements of this chapter and the DCSM shall be installed around any ground mounted resilient power supply systems and associated equipment.

From the ordinance

A resilient power supply system shall be required for the following new uses requiring a major site plan review: (1) Fueling station; (2) Retail sales that primarily sell unprepared food and have a gross floor area over 10,000 sq. ft.; (3) Retail sales that contain a pharmacy; (4) Hospital; (5) Nursing home; (6) Congregate/continuing care and assisted living facility; or (7) Broadcasting or telecommunications tower. (b) Resilient power supply systems shall be capable of providing a minimum of 48 hours of backup power. (c) Opaque screening meeting the requirements of this chapter and the DCSM shall be installed around any ground mounted resilient power supply systems and associated equipment. (d) Noise produced by resilient power supply systems shall not exceed the noise maximums of Chapter 58 (Environment).
Sec. 130-67