Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Zoning certification posting
The zoning certification shall be posted onsite in a conspicuous place during construction.
- Zoning certification required for certain structures and activities
The following specific uses and construction activities shall require written certification that they are in compliance with this chapter prior to approval or commencement of the activity: (1) The installation or construction of any permanent structure (such as a retaining wall, fence, shed, aboveground pool, or similar structure) or temporary structure as required by section 130-104 that exceeds a height of four feet or has a surface area exceeding 75 square feet, is otherwise regulated by the height, setback, or use requirements of this chapter, and does not require a building permit, a temporary directional sign permit, or a permit for a temporary use; (2) The change of use or occupant on any commercially or industrially zoned property; (3) Any activity requiring a building permit; (4) The installation of a new electric meter base or exterior lighting on commercially or industrially zoned property; (5) Any exterior repair, addition, or alteration to a structure within a designated historic overlay district; (6) The installation, modification, or construction of a residential driveway or off-street parking spaces, but not for repair, repaving, or surface treatments which do not increase the lot coverage of impervious surfaces; or (7) The storage on a residential lot of any vehicle registered for personal use and exceeding a gross weight of more than 10,000 pounds, in excess of 21 feet in length, or wider than 102 inches.
- Zoning certification review time10 working days
The request for zoning certification shall be made on a form provided by the city and shall be acted on within ten working days.
From the ordinance
The following specific uses and construction activities shall require written certification that they are in compliance with this chapter prior to approval or commencement of the activity: (1) The installation or construction of any permanent structure (such as a retaining wall, fence, shed, aboveground pool, or similar structure) or temporary structure as required by section 130-104 that exceeds a height of four feet or has a surface area exceeding 75 square feet...