Sec. 86-64, 86-65, 86-68, 86-72, 86-91
Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Reconsideration period after denial12 months
Upon the denial by the board of any application filed pursuant to this section, the same application or use shall not be reconsidered within 12 months of the date of denial.
- Maximum duration for temporary mobile homeManufactured homeA dwelling built in a factory to a federal standard and transported to the site. during construction18 months
The temporary conditional use permit shall be granted for a limited time period not to exceed 18 months.
- Maximum duration for temporary mobile homeManufactured homeA dwelling built in a factory to a federal standard and transported to the site. for medical care12 months
A temporary conditional use permit granted by the board of zoning appeals pursuant to this subsection shall not be authorized for a period of time beyond 12 months.
- Maximum duration for temporary sales trailer5 years
A mobile home used as a temporary sales trailer ... is not authorized to remain on the property for more than five years.
- Maximum duration for other temporary uses24 months
Such uses or structures shall be authorized by the issuance of a temporary and revocable permit for not more than a 24-month period.
Signage
- Hearing sign removal after final action15 days
All such signs shall be removed by the zoning administrator or designee within 15 days following the board of supervisor's final action.
- Hearing sign setbackSetbackThe distance a building must be held back from a lot line. from road10 ft
The sign shall be erected within ten feet of whatever boundary line of such land abuts a public road.
From the ordinance
The sign shall be erected within ten feet of whatever boundary line of such land abuts a public road. Temporary conditional uses for mobile homes and other temporary uses are authorized with time limits.