Winchester, Virginia · General provision

Sec. 18-17

Extracted standards

5 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Maximum initial permit duration1 year

    The maximum time for the initial temporary permit for mobile units other than mobile storage units is one year from the date of initial occupancy.

  • Prohibition of mobile units

    No mobile units shall be located within the corporate limits of the City unless specifically permitted by this Ordinance.

  • Maximum storage unit permit duration120 days

    The maximum time for the temporary permit mobile storage units is 120 days from the effective date of the permit.

  • Mobile storage units shall occupy an area no larger than ten percent of the gross floor area of the primary use served by the unit or 400 square feet whichever is greater.

  • Temporary permit for non-dwelling uses

    The Administrator may, upon application by a property owner or lessee, grant a temporary permit to locate a mobile unit to be used for non-dwelling purposes.

From the ordinance

No mobile units shall be located within the corporate limits of the City unless specifically permitted by this Ordinance. However, Section 18-17 shall not apply to mobile homes or mobile offices temporarily used at construction sites by contractors or subcontractors for non-dwelling purposes in conjunction with approved construction projects.
Sec. 18-17