Winchester, Virginia · General provision

Sec. 18-10.1-3

Extracted standards

5 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

Overlay

  • Certificate of Appropriateness in HW/CE overlays

    All solar energy systems must receive approval of a Certificate of Appropriateness if located within the Historic Winchester (HW) or Corridor Enhancement (CE) Overlay Districts.

From the ordinance

No solar energy system may exceed the height limitations applicable in the zoning district. All distribution lines for solar energy systems shall be installed underground. All batteries used in connection with a solar energy system must be located within an enclosed cabinet or within a building. All solar energy systems must receive approval of a Certificate of Appropriateness if located within the Historic Winchester (HW) or Corridor Enhancement (CE) Overlay Districts. Any solar energy system that is a principal use shall require a written decommissioning agreement...
Sec. 18-10.1-3