Shenandoah County Unincorporated, Virginia · General provision
Article IV, § 165-22B
Extracted standards
2 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- NonconformingNonconformingLawful when built, but not compliant with the rules now in force; usually allowed to continue but not to expand. structure rebuild period (federal disaster)4 years
The structure is repaired, rebuilt, or replaced within two years of the disaster, unless the structure is damaged or destroyed as the result of an event that is declared a federal disaster, in which case the structure shall be repaired, rebuilt, or replaced within four years of the disaster.
- NonconformingNonconformingLawful when built, but not compliant with the rules now in force; usually allowed to continue but not to expand. structure rebuild period (natural disaster)2 years
The structure is repaired, rebuilt, or replaced within two years of the disaster, unless the structure is damaged or destroyed as the result of an event that is declared a federal disaster, in which case the structure shall be repaired, rebuilt, or replaced within four years of the disaster.
From the ordinance
Where a lawfully existing nonconforming structure is damaged or destroyed by a natural disaster or other act of God, the structure can be repaired, rebuilt, or replaced to its preexisting size if: 1. The structure is repaired, rebuilt, or replaced within two years of the disaster...