Sec. 17-607 (Biomass conversion facility)
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum facility area4,000 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Any biomass conversion facility, not to include office or biomass storage space, shall occupy no more than four thousand (4,000) square feet.
- Minimum setbackSetbackThe distance a building must be held back from a lot line. from sensitive uses1,000 ft
Each biomass conversion facility shall be set back at least one thousand (1,000) feet, not subject to reduction, from the following: Incorporated town and city boundaries; Public wells, springs, and water resource areas; Designated urban growth areas; Residentially zoned districts; Manufactured home parks; Manufactured home subdivisions; Public schools; County, town and community recreation areas; and Jurisdictional waterways.
- Storage setbackSetbackThe distance a building must be held back from a lot line. from property lines150 ft
No structure used for storage of biomass and no outside storage of biomass shall be located closer than one hundred fifty (150) feet to any property line
- Storage setbackSetbackThe distance a building must be held back from a lot line. from road100 ft
no closer than one hundred (100) feet from the travel surface of public roadways.
From the ordinance
No structure used for storage of biomass and no outside storage of biomass shall be located closer than one hundred fifty (150) feet to any property line and no closer than one hundred (100) feet from the travel surface of public roadways.