Sec. 17-607 (Wireless Telecommunications Facilities)
Dimensional standards
Height & bulk
- Minimum landscaping
- 6%
Extracted standards
10 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Abandonment period6 months
Any component of a telecommunications facility that is not operated for a continuous period of six (6) months shall be considered abandoned
- Balloon test required for towers over this heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.100 ft
A balloon test shall be conducted prior to the public hearing before the board of supervisors for any telecommunications tower that exceeds one hundred (100) feet in height.
- Foundation removal depth2 ft
Foundations shall be removed to a depth of two (2) feet below ground level or covered to an equivalent depth with fill material.
- Landscaping buffer heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.6 ft
Plant material shall be designed to screen the facility to a height of at least six (6) feet above ground level.
- Removal timeframe after notice90 days
shall be removed by the owner or operator of such component within ninety (90) days of receipt of notice
- Security fence heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.6 ft
Wireless telecommunications facilities shall be enclosed by security fencing not less than six (6) feet in height
- SetbackSetbackThe distance a building must be held back from a lot line. from off-site structures used for human habitation (percent of heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.)150 pct
a distance equal to one hundred fifty (150) percent of the height of the structure from any off-site structures used for human habitation.
- SetbackSetbackThe distance a building must be held back from a lot line. from property lines (percent of heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.)110 pct
Antenna support structures shall be set back a distance equal to one hundred ten (110) percent of the height of the structure from all adjacent property lines
- Maximum sign area4 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
The sign shall not exceed four (4) square feet in size
- Stealth design required
In the R-1, R-2, R-3, PSF, PMF, R-4, R-5, MH-1, and MHP zoning districts, all wireless telecommunications facilities shall be stealth.
From the ordinance
In the R-1, R-2, R-3, PSF, PMF, R-4, R-5, MH-1, and MHP zoning districts, all wireless telecommunications facilities shall be stealth.