Extracted standards
6 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Hours of operation determined during SUP
Hours of operation and active blasting hours shall be determined during the special use permit process.
- Minimum berm heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.8 ft
Any berms constructed on the perimeter of the operation shall be at least eight (8) feet high and not steeper than a 3:1 slope.
- Minimum fence heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.5 ft
Any fences constructed on the perimeter of the operation for the purpose of preventing access to the property shall be at least five (5) feet high and set back from any on-site excavation by at least fifty (50) feet.
- Minimum setbackSetbackThe distance a building must be held back from a lot line. from non-participating parcel300 ft
Any activity, use, facilities, equipment, structure, or storage, with the exception of offices, shall be located at least three hundred (300) feet from a non-participating parcel.
- Minimum setbackSetbackThe distance a building must be held back from a lot line. for office/administrative buildings100 ft
Buildings devoted solely to office/administrative uses shall be located not less than one hundred (100) feet from a non-participating parcel.
- Screening/planting/fencing plan required
A plan for screening, planting, fencing, preservation of trees, or other requirements to ensure the minimal impact of the use on surrounding uses shall be submitted as a part of the special use permit application.
From the ordinance
Any activity, use, facilities, equipment, structure, or storage, with the exception of offices, shall be located at least three hundred (300) feet from a non-participating parcel.