Rockingham County Unincorporated, Virginia · General provision
Definitions
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Large solar min area2 acresacre43,560 square feet — about the size of an American football field without the end zones.
occupying more than two (2) acres of total land area.
From the ordinance
Solar energy facility, large. An energy conversion system consisting of photovoltaic panels, their support structures, and associated infrastructure, such as but not limited to control, conversion, and transmission hardware, and energy storage systems, occupying more than two (2) acres of total land area. "Occupying" means actual ground coverage, not acreage of the parcel on which the facility is installed.