Rockingham County Unincorporated, Virginia · General provision

Sec. 17-117

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Permits issued prior to adoption6 months

    Nothing contained herein shall require any change in the plans or construction of any building or structure for which a permit was granted prior to October 1, 2014. However, if such construction does not commence within six (6) months after the issuance of a building permit, further construction shall be in conformity with the provision of this chapter for the district in which the operation is located.

From the ordinance

Nothing contained herein shall require any change in the plans or construction of any building or structure for which a permit was granted prior to October 1, 2014. However, if such construction does not commence within six (6) months after the issuance of a building permit, further construction shall be in conformity with the provision of this chapter for the district in which the operation is located.
Sec. 17-117