Botetourt County Unincorporated, Virginia · General provision
Sec. 25-442
Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum floor area for temporary structures400 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
Structures shall not exceed four hundred (400) square feet in floor area
- Maximum permit duration30 days
Permits shall be valid for a period not to exceed thirty consecutive (30) days
- Minimum separation between events30 days
each event or activity on a site shall be separated by a period of not less than thirty (30) consecutive days.
Parking
- Adequate on-site parking required
Adequate on-site parking is provided for the activity intended.
Setback
- Minimum setbackSetbackThe distance a building must be held back from a lot line. from public road right-of-way30 ft
nor be closer than thirty (30) feet to a public road right-of-way.
From the ordinance
Structures shall not exceed four hundred (400) square feet in floor area nor be closer than thirty (30) feet to a public road right-of-way.