Botetourt County Unincorporated, Virginia · General provision
Sec. 25-439(8)
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum storage duration for green lumber90 days
Green lumber and other associated products or by-products from the operation shall not be stored on the site for more than ninety (90) days.
- SetbackSetbackThe distance a building must be held back from a lot line. from lot line100 ft
and one hundred (100) feet from any lot line.
- SetbackSetbackThe distance a building must be held back from a lot line. from existing residence on adjoining lot200 ft
A temporary sawmill shall be located at least two hundred (200) feet from any existing residence located on an adjoining or adjacent lot.
- Timber source restriction
A temporary sawmill shall only process timber cut from the parcel on which the temporary sawmill is located or on immediately adjacent parcels.
From the ordinance
A temporary sawmill shall be located at least two hundred (200) feet from any existing residence located on an adjoining or adjacent lot, and one hundred (100) feet from any lot line.