Botetourt County Unincorporated, Virginia · General provision

Sec. 25-446(o)

Extracted standards

6 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Lighting

  • Lighting restriction

    Wind energy system towers shall not be artificially lighted unless required by the FAA or appropriate authority.

Noise

  • Maximum sound level at property line60 dB

    Audible sound from a wind energy system shall not exceed sixty (60) decibels, as measured from any adjacent non-participating landowners' property line.

Other

  • Minimum blade clearance from ground15 ft

    The minimum distance between the ground and any protruding blades utilized on a wind energy system shall be fifteen (15) feet, as measured at the lowest point of the arc of the blades.

  • The base of the tower shall not be climbable for a distance of fifteen (15) feet above ground surface.

  • Underground transmission lines required

    Any on site transmission or power lines shall be placed underground, unless written evidence is provided, satisfactory to the board of supervisors during the special exception permit process.

Signage

From the ordinance

Audible sound from a wind energy system shall not exceed sixty (60) decibels, as measured from any adjacent non-participating landowners' property line.
Sec. 25-446(o)