Botetourt County Unincorporated, Virginia · General provision
Sec. 25-439(8)
Extracted standards
4 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Maximum storage duration for green lumber90 days
Green lumber and other associated products or by-products from the operation shall not be stored on the site for more than ninety (90) days.
- Minimum setbackSetbackThe distance a building must be held back from a lot line. from lot line100 ft
A temporary sawmill shall be located at least one hundred (100) feet from any lot line.
- Minimum setbackSetbackThe distance a building must be held back from a lot line. from existing residence200 ft
A temporary sawmill shall be located at least two hundred (200) feet from any existing residence located on an adjoining or adjacent lot.
- No buildings for storage/drying/processing
No building or structure shall be erected for the storage, drying or processing of timber, or for residential purposes associated solely with the operation.
From the ordinance
A temporary sawmill shall be located at least two hundred (200) feet from any existing residence located on an adjoining or adjacent lot, and one hundred (100) feet from any lot line.