Sec. 25-439
Extracted standards
5 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Direct access to state-maintained road
Such uses shall have direct access to a state-maintained, minimum two-lane road, with adequate capacity to serve the traffic generated by size and type of the mill and associated truck traffic.
- Maximum operation area5 acresacre43,560 square feet — about the size of an American football field without the end zones.
The area involved with the mill operation, including structures, storage and loading, shall not exceed five (5) acres, unless otherwise provided for by conditions established through the special exception process.
- Minimum setbackSetbackThe distance a building must be held back from a lot line. from lot line300 ft
No structure housing or enclosing a sawmill, nor any structure, nor storage of lumber, logs, timber, equipment or any other materials shall be located closer than three hundred (300) feet to any lot line.
- Permit term2 years
The permit shall be granted for a period not to exceed two years, upon which time it shall be reviewed by the board of supervisors.
- Screening required
Screening of the site shall be sufficient to ensure a minimal visual impact on adjacent uses, and the board shall impose conditions sufficient to provide such assurance.
From the ordinance
No structure housing or enclosing a sawmill, nor any structure, nor storage of lumber, logs, timber, equipment or any other materials shall be located closer than three hundred (300) feet to any lot line.