Haymarket
Zoning districts
6 districts, grouped by category.
Commercial
2Other
1General provisions
180 rules that bind every district rather than one — sign regulations, parking, floodplain and the rest of the code’s citywide chapters.
All grocery stores shall be subject to the following general standards: (1) Entrances to the site shall be minimized ...
A proposed liquor store shall not be located within 500 feet of an existing liquor store. This distance shall be measured from the property line of one business to the property line of the other.
The following general standards shall apply to all liquor stores: (1) A proposed liquor store shall not be located within 500 feet of an existing liquor store. ...
The following general standards shall apply to all wholesale sales: (1) Loading areas shall be sited in such a way so as to minimize the impact on any surrounding neighborhood. (2) Parking shall be located behind the front line of the principal building.
Accessory outdoor storage up to ten percent of the building area may be permitted. Outdoor storage shall be located to the rear of the principal building.
Industrial, light. (1) The use, storage, and disposal of hazardous materials shall meet all applicable federal, state, and local codes. (2) Accessory outdoor storage up to ten percent of the building area may be permitted.
Roof mounted solar energy systems ... are permitted in the R-1, R-2, B-1, B-2, T-C, C-1, and I-1 zoning districts as accessory use ... Solar panels attached to a roof shall not exceed the maximum permitted height of the structure type by more than five feet.
Roof mounted solar energy systems ... are permitted in the ... T-C ... zoning districts as accessory use
All solar energy systems within the historic boundary or on a historic resource property must obtain a certificate of appropriateness.
Temporary family health care structures shall be subject to the following standards: ... The structure shall be no more than 300 gross square feet ...
Cemeteries shall be subject to the following general standards: (1) Minimum lot requirement: Five acres. (2) Minimum frontage: 100 feet on an arterial street.
Cemeteries shall be subject to the following general standards: (1) Minimum lot requirement: five acres. (2) Minimum frontage: 100 feet on an arterial street. (3) No graves shall be located within the buffer yards. (4) All driveway shoulders shall be constructed with a reinforced grass system approved by the administrator.
The following general standards shall apply to all parking facilities: (1) No motor vehicle work shall be permitted ... (2) Parking shall be the principal use of all parking facilities.
The following general standards shall apply to all parking facilities: (1) No motor vehicle work shall be permitted in association with a parking facility except under emergency service work. (2) Parking shall be the principal use of all parking facilities. Spaces may be rented for parking, but no other business of any kind shall be conducted in the structure.
This section shall be known, cited, and referred to as 'The Town of Haymarket Subdivision Ordinance'.
An approved final site plan shall be valid for a period of not less than five years from the date of approval thereof or for such longer period as the local planning commission or other agent may, at the time of approval, be determined to be reasonable
As a condition to the approval of a final site plan, the owner or developer shall be required to guarantee completion of the public and other site-related improvements associated with the development prior to approval of the final plat.
The purpose of the special use procedure is to provide for certain uses which, by their nature, can have an undue impact upon or be incompatible with other uses of land within a certain zoning district and therefore require the exercise of planning judgment.
An applicant shall submit a preliminary site plan for review. Such preliminary site plan, prepared by a licensed engineer or land surveyor, or in the case of minor site plans, in a form acceptable to the Administrator, shall be reviewed and returned to the applicant with comments within 60 days.
A plat notation to retain an undisturbed and vegetated 100-foot-wide buffer area located along other water bodies with perennial flow.
Source documents
The chapters of the adopted code that were retrieved, read and extracted from. Everything above traces back to one of these.
- Chapter 115.9K charsRead →
- Chapter 1017.6K charsRead →
- Chapter 116.3K charsRead →
- Chapter 126.7K charsRead →
- Chapter 136.4K charsRead →
- Chapter 146.3K charsRead →
- Chapter 155.3K charsRead →
- Chapter 1632.6K charsRead →
- Chapter 1755.7K charsRead →
- Chapter 1844K charsRead →
- Chapter 1947.3K charsRead →
- Chapter 2149.8K charsRead →
- Chapter 2030K charsRead →
- Chapter 21100.8K charsRead →
- Chapter 2280.6K charsRead →
- Chapter 380.9K charsRead →
- Chapter 4156K charsRead →
- Chapter 58.3K charsRead →
- Chapter 64.1K charsRead →
- Chapter 716.7K charsRead →
- Chapter 87.9K charsRead →
- Chapter 99.8K charsRead →