Municipality · Virginia

Danville

The ordinance has been retrieved, read and turned into structured rules.
1
Districts
375
Extracted rules
1,794
Standards
41
Chapters read

Zoning districts

1 districts, grouped by category.

General provisions

374 rules that bind every district rather than one — sign regulations, parking, floodplain and the rest of the code’s citywide chapters.

Article 12, Section I, § 1(g)1 standards

City issuance of a land disturbance permit (for projects with greater than 5,000 square feet of disturbed land area.)

Article 12, Section I, § 4(a)(3)1 standards

The period of the initial bond (surety) agreement shall be not less than twelve (12) months from its effective date.

Article 12, Section I, § 4(e)2 standards

The maintenance (defect) shall be in an amount and form satisfactory to the City Attorney but in no instance shall be less than ten (10) percent of the total construction cost of the improvements subject to the bond. The maintenance bond may be released at the end of two (2) years from the date of City acceptance of responsibility.

Article 12, Section I, § 51 standards

No work on a new building or addition that is required to have either a minor or major site plan and is located within five (5) feet of any required setback shall be approved to proceed above the foundation or slab until the building inspections office has received a survey...

Article 12, Section I, §1(g)1 standards

City issuance of a land disturbance permit (for projects with greater than 5,000 square feet of disturbed land area.)

Article 12, Section I, §4(a)(3)1 standards

The period of the initial bond (surety) agreement shall be not less than twelve (12) months from its effective date.

Article 12, Section I, §4(e)(2)1 standards

The maintenance (defect) shall be in an amount and form satisfactory to the City Attorney but in no instance shall be less than ten (10) percent of the total construction cost of the improvements subject to the bond.

Article 12, Section I, §4(f)1 standards

As-built construction drawings for all improvements subject to bonding shall be provided to the City on mylar prior to the release of any bond amounts.

Article 12, Section I, §51 standards

No work on a new building or addition that is required to have either a minor or major site plan and is located within five (5) feet of any required setback shall be approved to proceed above the foundation or slab until the building inspections office has received a survey...

Article 12, Section L1 standards

To ensure that proposed single family uses and related lot development activities are compatible with approved subdivision plats and public improvements plans and to ensure consistency with the underlying residential zoning district regulations, a single family lot plan shall be required in the City's single family residential zoning districts.

Article 12, Section L1 standards

a single family lot plan shall be required in the City's single family residential zoning districts.

Article 12, Section L2 standards

a single family lot plan shall be required in the City's single family residential zoning districts. The single family residential lot plan shall be reviewed and acted upon by the City Manager within ten (10) working days upon receipt and application for a zoning permit or building permit.

Article 12, Section M1 standards

Within thirty (30) days following satisfactory completion... a 'Certificate of Substantial Completion' shall be issued

Article 12, Section M1 standards

Within thirty (30) days following satisfactory completion, inspection and approval of the installation of all required improvements, and upon the satisfactory compliance with the provisions of this ordinance and the City's Design and Construction Standards Manual, a 'Certificate of Substantial Completion' shall be issued

Article 12, Section N1 standards

Appeals of a decision of the Planning Commission by the applicant or a party in interest regarding a site plan, waiver, variation or substitution shall be to the City Council, provided that such appeal is filed with the City Manager within ten (10) calendar days of the decision being appealed.

Article 12, Section N, §21 standards

such appeal is filed with the City Manager within ten (10) calendar days of the decision being appealed.

Article 12, Sections E and F5 standards

The preliminary site plan shall show the following: ... scale (to be one inch equal not more than thirty (30) feet, with a maximum sheet size of 24" x 36"...

Article 12, Sections H and I5 standards

Final approval of any site plan ... shall expire five (5) years after the date of such approval ... The period of the initial bond (surety) agreement shall be not less than twelve (12) months ...

Article 13, Section G8 standards

The following buildings and uses are permitted as special exceptions under the terms and conditions specified hereinabove: a. A garage or other building accessory to a single family dwelling which building does not comply with the regulations of the district in which it is located.

Article 13, Section G.65 standards

The following buildings and uses are permitted as special exceptions under the terms and conditions specified hereinabove: a. A garage or other building accessory to a single family dwelling which building does not comply with the regulations of the district in which it is located.

Source documents