Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Foundation survey required within distance from setbackSetbackThe distance a building must be held back from a lot line.5 ft
No work on a new building or addition that is required to have either a minor or major site plan and is located within five (5) feet of any required setback shall be approved to proceed above the foundation or slab until the building inspections office has received a survey prepared by a certified land surveyor licensed to practice in Virginia
From the ordinance
No work on a new building or addition that is required to have either a minor or major site plan and is located within five (5) feet of any required setback shall be approved to proceed above the foundation or slab until the building inspections office has received a survey...