Chapter 18, Section 18.100.030
Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Emergency overhead period10 days
overhead facilities may be installed and maintained for a period, not to exceed ten days, without authority of the county engineer in order to provide emergency service.
- Encroachment permit required
If an encroachment is made upon any publicly maintained road, a permit therefor shall be required from the appropriate agency.
- High voltage exception34,500 volts
Poles, overhead wires and associated overhead structures used for the transmission of electric energy at nominal voltages in excess of thirty-four thousand five hundred volts.
- Maximum fine500 dollars
punished by a fine not exceeding five hundred dollars
- Maximum imprisonment6 months
imprisonment not exceeding six months
- Overhead wires prohibitedProhibitedNot allowed in the district at all, short of rezoning or a variance.
It is unlawful to erect, construct, place, keep, maintain, continue, employ or operate poles, overhead wires and associated overhead structures in the district after the date when the overhead facilities are required to be removed.
- Underground service connection required
Every person owning, operating, leasing, occupying or renting a building or structure within a district shall perform construction and provide that portion of the service connection on his property between the facilities referred to in Section 18.100.070 and the termination facility on or within the building or structure being served
From the ordinance
It is unlawful for any person or utility to erect, construct, place, keep, maintain, continue, employ or operate poles, overhead wires and associated overhead structures in the district after the date when the overhead facilities are required to be removed.