Lassen County Unincorporated, California · District

A-3

Agricultural District

Dimensional standards

A-3 lot requirementsSTREETbuildable areaFront 20 ftRear 20 ftSide 10 ftMIN LOT AREA75 ac
Plan view of the district’s stated lot requirements. Solid line: the property line. Dashed: the setback lines the ordinance imposes; a building must stay inside the tinted envelope. Drawn from the figures extracted below — illustrative, not a survey.

Uses

Permitted by right7

Conditional / special use8

  • Commercial feedlots, stockyards, commercial hog ranches, animal auction and sale yards, dairies, poultry and fowl production
  • Fertilizer plants and yards, agricultural and dairy processing plants, rendering plants or slaughter houses
  • Geothermal production other than associated with greenhouses
  • Animal hospitals
  • Airports for commercial farm services, commercial excavation of natural materials
  • Sales, rental, service and commercial repair of farm and agricultural equipment
  • Public stables
  • Kennels (if a residential use is not first established)

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

From the ordinance

Minimum Parcel Size. Seventy-five acres... the minimum setbacks shall be as follows: Accessory buildings ... not less than twenty feet from any side or rear property line and not less than fifty feet from the property line and not less than twenty feet from any dwelling unit on the property.
§ 18.20.050