Extracted standards
9 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Appeal period30 days
within 30 days after the filing of the decision in the office of the BZA
- BZA decision period30 days
The BZA shall decide upon the application within 30 days from the date of such hearing.
- CUP discontinuance period730 days
Expiration of a conditional use permit shall occur with the discontinuance or suspension for a period of two years
- CUP effectivation period365 days
A conditional use permit must be put into effect within one year from the date the permit is issued
- Planning Commission recommendation period100 days
shall, within 100 days from the date of filing of a completed application, submit a report of its recommendation to the Town Council
- Sign posting period15 days
These signs shall be posted at least 15 days prior to the public hearing.
- Re-application interval12 months
shall not initiate action for a variance before the BZA relating to the same parcel of land more often than once every 12 months
- Town Council action period365 days
shall take action on the proposed conditional use application within one year from the filing date of application
- Minimum varianceVariancePermission to depart from a specific dimensional rule, granted on a showing of hardship. sign area1.5 sqftsq ftSquare feet. An acre is 43,560 sq ft; a typical suburban lot is 7,000–10,000.
each of which shall not be less than one and one-half square feet in area
From the ordinance
An application for a variance shall be made to the Planning and Zoning Administrator. The BZA shall decide upon the application within 30 days from the date of such hearing.