Article 30, Sections 1-5

Extracted standards

5 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Application coincident with building permit

    Certificates of occupancy and compliance shall be applied for coincident with the application for a building permit, and shall be issued within ten (10) days after the erection or structural alteration of such buildings shall have been completed in conformity with the provisions of these regulations.

  • Certificate of occupancy required for premises and buildings

    No premises shall be used, and no buildings hereafter erected or structurally altered shall be used, occupied, or changed in use, until a certificate of occupancy and compliance shall have been issued by the building inspector.

  • Certificate of occupancy required for vacant land

    No vacant land shall be occupied or used, except for agricultural uses, until a certificate of occupancy shall have been issued by the building inspector.

  • Excavation permit requires certificate application

    No permit for excavation for any building shall be issued before application has been made for certificate of occupancy and compliance.

  • A certificate of occupancy shall be required of all nonconforming uses. Application for a certificate of occupancy for nonconforming uses shall be filed, within twelve (12) months from the effective date of this ordinance, with the building inspector.

From the ordinance

No vacant land shall be occupied or used, except for agricultural uses, until a certificate of occupancy shall have been issued by the building inspector. No premises shall be used, and no buildings hereafter erected or structurally altered shall be used, occupied, or changed in use, until a certificate of occupancy and compliance shall have been issued...
Article 30, Sections 1-5