Petersburg, Virginia · General provision

Article 21, Section 3

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Signage

  • Sign permit validity period6 months

    A sign permit shall become null and void if the work for which the permit was issued has not been completed within a period of six months after the date of issuance of the permit.

From the ordinance

A sign permit shall be required to erect, structurally alter, relocate or replace any sign within the city, except as otherwise provided herein.
Article 21, Section 3