Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Signage
- Sign permit validity period6 months
A sign permit shall become null and void if the work for which the permit was issued has not been completed within a period of six months after the date of issuance of the permit.
From the ordinance
A sign permit shall be required to erect, structurally alter, relocate or replace any sign within the city, except as otherwise provided herein.