Page County Unincorporated, Virginia · General provision
§ 125-4
Extracted standards
1 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Lot
- Lot widthLot widthHow wide a lot must be, usually measured at the front setback line. measurement point
The horizontal distance between side lot lines measured at the setback line.
From the ordinance
LOT, WIDTH OF: The horizontal distance between side lot lines measured at the setback line.