Manassas Park, Virginia · General provision

Sec. 31-34

Dimensional standards

Extracted standards

1 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • The installation or construction of a new structure that is not more than fifty (50) feet above ground level, provided that the structure with attached wireless facilities is (i) not more than ten (10) feet above the tallest existing utility pole located within five hundred (500) feet of the new structure within the same public right-of-way or within the existing line of utility poles; (ii) not located within the boundaries of a local, state, or federal historic district; and (iii) designed to support small cell facilities; or (2) The co-location on any existing structure of a wireless facility that is not a small cell facility.

From the ordinance

The installation or construction of a new structure that is not more than fifty (50) feet above ground level, provided that the structure with attached wireless facilities is (i) not more than ten (10) feet above the tallest existing utility pole located within five hundred (500) feet of the new structure within the same public right-of-way or within the existing line of utility poles; (ii) not located within the boundaries of a local, state, or federal historic district; and (iii) designed to support small cell facilities; or (2) The co-location on any existing structure of a wireless facility that is not a small cell facility.
Sec. 31-34