Kilmarnock, Virginia · General provision

Sec. 54-482(c)

Dimensional standards

Servicing

Applies near
RPAs and RMAs
Geographic extent
Applies to land within Resource Protection Areas (RPAs) and Resource Management Areas (RMAs) designated by the council.

Extracted standards

17 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Agricultural activities may encroach into the landward 50 feet of the 100-foot-wide buffer area when at least one agricultural best management practice ... is being implemented

  • Agricultural activities may encroach within the landward 75 feet of the 100-foot-wide buffer area when agricultural best management practices which address erosion control, nutrient management, and pest chemical control, are being implemented

  • Buffer encroachment seaward limit50 ft

    The encroachment may not extend into the seaward 50 feet of the buffer area.

  • Buffer nutrient reduction40 pct

    The 100-foot buffer area shall be deemed to achieve a 75 percent reduction of sediments and a 40 percent reduction of nutrients.

  • Buffer sediment reduction75 pct

    The 100-foot buffer area shall be deemed to achieve a 75 percent reduction of sediments and a 40 percent reduction of nutrients.

  • Buffer width100 ft

    A 100-foot buffer area shall be located adjacent to and landward of other RPA components and along both sides of any water body with perennial flow.

  • The total amount of impervious surface within an RMA shall not exceed the following: [table omitted]

  • Maximum land disturbance60 pct

    Land disturbance, in accordance with an approved site plan, shall be limited to 60 percent of the site and shall be clearly shown on submitted plans and physically marked on the development site.

  • Minimum tree DBH to preserve6 inches

    all trees located outside the area of land disturbance with a DBH of six inches or more shall be preserved

  • Any development or redevelopment exceeding 2,500 square feet of land disturbance shall be accomplished through a plan of development process

  • Post-development pollutant load

    For development, the post-development nonpoint source pollution runoff load shall not exceed the pre-development load based on the calculated average land cover conditions.

  • Redevelopment pollutant reduction10 pct

    For redevelopment the nonpoint source pollution load shall be reduced by at least ten percent.

  • Replacement tree minimum caliper2.5 inches

    Replacement trees shall be a minimum 2.5 inches caliper at the time of planting.

  • Reserve sewage disposal site required

    A reserve sewage disposal site with a capacity at least equal to that of the primary sewage disposal site shall be provided

  • Septic pump-out frequency5 years

    All on-site sewage disposal systems not requiring a Virginia Pollutant Discharge Elimination System permit shall be pumped out at least once every five years

  • Stormwater facility installation time18 months

    All required stormwater management facilities or other specifications shall be installed and approved within 18 months of project commencement.

  • Tree replacement ratio2 ratio

    replacement of existing trees and other vegetation will be achieved at a ratio of two planted trees to one removed

From the ordinance

Development or redevelopment of land lying within RPAs and RMAs designated by the council shall comply with all federal, state and county erosion and sediment control requirements, best management practices and the performance standards for development or redevelopment.
Sec. 54-482(c)