Emporia, Virginia · General provision

Sec. 90-435

Extracted standards

5 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Design

Height

Other

  • Maximum generation5 MW

    Maximum generation of five megawatts (five MW).

  • Minimum generation500 kW

    Minimum generation of 500 kilowatts (500 KW).

  • The solar energy facility shall comply with all setback requirements of the district in which it is located. Regardless of whether a medium-scale solar facility is accessory to another use on the lot, all medium-scale solar facilities shall comply with the district's principal structure setbacks.

From the ordinance

Minimum generation of 500 kilowatts (500 KW). Maximum generation of five megawatts (five MW). ... If the medium-scale solar energy facility is ground-mounted or not flush-mounted on a principal or accessory building, the facility's height shall not exceed 15 feet at the tallest point. ... The lowest surface of any panel shall be a maximum of four feet above the finished grade
Sec. 90-435