Dimensional standards
Uses
Permitted by right5
Conditional / special use1
Accessory1
Extracted standards
3 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Height
- SetbackSetbackThe distance a building must be held back from a lot line. increase for heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. over 45 ft1 ft/ft
provided that required front, side, and rear setback minimum standards shall be increased 1 foot for each foot in height over 45 ft.
Other
- AccessoryAccessory useA secondary activity customarily incidental to the main use of the lot — a garage, a home office. structure heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first. limit
No taller than principal structure
- AccessoryAccessory useA secondary activity customarily incidental to the main use of the lot — a garage, a home office. structures in front yardYardThe open space left between a building and its lot line — the space a setback creates.
Not permitted in front yard
From the ordinance
The intent of this district is to provide sufficient space in appropriate locations for less intense industrial uses, such as research facilities, wholesale, warehousing, light industrial, and heavy commercial uses. Principal structures in industrial districts may be erected to a height of 60 ft.