Emporia, Virginia · General provision

Sec. 90-564

Extracted standards

3 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Other

  • Rebuild time after disaster4 years

    The time period shall be extended to four years under a federal disaster declaration.

  • Rebuild time after damage2 years

    The work is done within two years unless the building is in an area under a federal disaster declaration and was damaged or destroyed as a direct result of the disaster, in which case the time period shall be extended to four years.

  • Repair work limit12 months

    Work may be done in any period of 12 consecutive months if it constitutes routine maintenance or minor alterations.

From the ordinance

On any nonconforming structure or portion of a structure containing a nonconforming use, work may be done in any period of 12 consecutive months if: Such repair constitutes routine maintenance necessary to keep the structure or improvement in the same general condition...
Sec. 90-564