Extracted standards
10 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Design
- Equipment enclosure
All equipment must be enclosed or screened by a wall or barrier to reduce visual and noise impacts.
Noise
- Noise impact assessment required
Pre- and post-construction noise impact assessments required to comply with the noise ordinance.
Other
- Backup systems required
Facility must include backup systems for critical load continuity.
- Landscaping and buffering required
Required per article VIII, community design standards.
- Utility demand documentation
Applicant must provide documentation of available electrical service capacity.
- Utility impact assessment
A utility impact assessment must be submitted from the service provider (e.g. Dominion Energy).
- Water cooling standards
If water cooling is used, system must meet public works and environmental guidelines.
- Water efficiency and monitoring
Water efficiency and monitoring systems are required.
Parking
- Parking requirement
Same requirements as warehousing and distribution.
Setback
- Minimum setbackSetbackThe distance a building must be held back from a lot line. from residential districtZoning districtA mapped area with one set of rules, identified by a code like R-1 or B-2. or property100 ft
Minimum 100 feet from adjacent residential district or property, including backup generators or outdoor equipment.
From the ordinance
All equipment must be enclosed or screened by a wall or barrier to reduce visual and noise impacts. Minimum 100 feet from adjacent residential district or property, including backup generators or outdoor equipment.