Dimensional standards
Height & bulk
- Minimum landscaping
- 4%
Extracted standards
7 individual requirements pulled out of this section’s prose, each with the sentence it came from.
Other
- Abandonment period24 months
Any antenna or tower that is not operational for a continuous period of 24 months shall be considered abandoned, and the owner of each such antenna or tower shall remove the tower.
- Landscaping buffer width4 ft
The standard buffer shall consist of a landscaped strip at least four feet wide outside the perimeter of the facilities.
Telecommunication facilities shall be designed not to exceed an overall height of 199 feet except as otherwise approved in the conditions of the conditional use permit.
- Minimum setbackSetbackThe distance a building must be held back from a lot line. from commercial property50 ft
Fifty feet from any property line which abuts a commercial or industrial district.
- Minimum setbackSetbackThe distance a building must be held back from a lot line. from residential property100 ft
One hundred feet from any property line which abuts a residential or planned development district
- Minimum setbackSetbackThe distance a building must be held back from a lot line. from residential structure250 ft
The tower shall be set back from any off-site residential structure at least 250 feet.
- Security fence heightMaximum heightThe tallest a building may be, given in feet, in storeys, or both — whichever binds first.6 ft
Unless otherwise specified, a minimum six feet high chain link fence, incorporating an anti-climb device and locked access gate, shall be provided.
From the ordinance
Telecommunication facilities shall be designed not to exceed an overall height of 199 feet except as otherwise approved in the conditions of the conditional use permit.