Emporia, Virginia · General provision

Sec. 90-436

Dimensional standards

Extracted standards

10 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Design

Height

Other

  • Decommissioning requirements

    Small-scale solar energy facilities which have reached the end of their useful life, have been abandoned, or have not been in active and continuous service for a period of 12 months shall be removed at the owner's or operator's expense.

  • Inspection access

    The owner will allow designated city staff access to the facility for inspection purposes.

  • Landscaping and screening for ground-mounted

    Landscaping and screening shall be provided for ground mounted solar to block visibility of the panel(s) and ancillary equipment from adjacent properties.

  • Maximum generation500 kW

    Maximum generation of 500 kilowatts (500 KW).

  • Site plan required

    Site plans shall be required for all small-scale solar energy facilities.

Setback

From the ordinance

Maximum generation of 500 kilowatts (500 KW). ... If the small-scale solar energy facility is ground-mounted or not flush-mounted on a principal or accessory building, the facility's height shall not exceed 15 feet at the tallest point.
Sec. 90-436