Emporia, Virginia · General provision

Sec. 90-435

Dimensional standards

Extracted standards

15 individual requirements pulled out of this section’s prose, each with the sentence it came from.

Design

Height

Other

  • Compliance with all applicable regulations

    All medium-scale solar energy facilities shall fully comply with all applicable local regulations, as well as all applicable state and federal regulations.

  • Consumption uses

    Generated electricity may be used for on-site consumption, provided to electric cooperative member-customers, or distributed for commercial consumption.

  • Decommissioning and reclamation plan required

    All applications for a medium-scale solar energy facility shall require a decommission and reclamation plan.

  • Grid-tied system approval

    No grid-tied system shall be installed until evidence has been given that the owner has been approved by the utility company.

  • Inspection access

    The owner will allow designated city staff access to the facility for inspection purposes.

  • Landscaping and screening for ground-mounted

    Landscaping and screening shall be provided for ground mounted solar to block visibility of the panel(s) and ancillary equipment from adjacent properties.

  • Liability insurance required

    The owner shall provide proof of adequate liability insurance for a medium-solar facility prior to beginning construction.

  • Limited land disturbance

    The clearing, grading, and overall site disturbance is limited to only that which is necessary.

  • Maximum generation5 MW

    Maximum generation of five megawatts (five MW).

  • Minimum generation500 kW

    Minimum generation of 500 kilowatts (500 KW).

Setback

From the ordinance

Minimum generation of 500 kilowatts (500 KW). Maximum generation of five megawatts (five MW). ... If the medium-scale solar energy facility is ground-mounted or not flush-mounted on a principal or accessory building, the facility's height shall not exceed 15 feet at the tallest point.
Sec. 90-435